Runco 3Dimension D-113d Especificaciones Pagina 46

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 152
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 45
Installation
30 D-113d Projection System Installation/Operation Manual
PRE
L
IMINAR
Y
4. Place the bottom projection unit (the one with pockets and tapped holes in place of
the cosmetic caps on the top) upside down on a smooth, flat surface covered with a
blanket or other soft material. Loosen and remove the two front feet on the projection
unit.
5. Repeat Step 3 for the bottom projection unit.
3.5
Assembling the
Projection System
The top and bottom projection units must be secured to each other using the four (4),
supplied spacer legs and associated hardware.
Attaching the Spacer Legs
to the Top Projection Unit
Using a hex wrench and eight (8) of the supplied, M6 x 16mm socket-head cap screws,
attach the spacer legs to the top projection unit as shown in Figure 3-7.
Figure 3-7. Attaching the Spacer Legs to the Top Projection Unit
DO NOT OVER-TIGHTEN THE SCREWS.
Caution
1
Screw, M6 x 16mm
Socket-Head Cap
(8x)
2
Spacer Leg (4x)
Vista de pagina 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 ... 151 152

Comentarios a estos manuales

Sin comentarios